After mold cleanup, get an independent assessment of whether the accessible work areas meet the agreed clearance criteria. We document what was checked and any follow-up needed.
When to schedule a clearance inspection
Arrange the visit after the contractor finishes the agreed cleanup and while the treated areas are still accessible. Coordinate the timing before reconstruction covers surfaces that need to be checked.
Bring the original inspection findings, the contractor’s scope, and any written criteria for completion. Those documents help define the areas to review, what conditions to look for, and whether sampling belongs in the plan.

What gets checked after remediation
How clearance is evaluated
Review the agreed criteria
We review the remediation scope, which areas were treated, and any documentation the contractor can provide.
Inspect the completed areas
We look for remaining visible concerns or debris and evaluate moisture conditions where appropriate. We consider sampling when the criteria or inspection warrant it.
Document the outcome
We record which criteria were met in the areas we inspected and identify any items that need more work or follow-up.
What the clearance report includes
Your report identifies the work areas assessed, the criteria used, the observations and any lab findings, and which items met the criteria. If something still needs attention, it identifies the item so you and the contractor can plan follow-up.
What affects your clearance quote
The number and size of treated areas, access, project criteria, any sampling and lab analysis, and whether a return visit is needed affect the quote. Share the cleanup scope and target completion date so we can discuss the appropriate scope and timing.
Clearance Inspection FAQs
When should clearance happen?
After the agreed remediation work is complete and while the work area is still accessible. If reconstruction is planned, coordinate the inspection timing with your contractor.
Is air sampling always part of clearance?
It depends on the project criteria and site conditions. We explain which verification steps apply to the scope.
What happens if something needs more work?
We document the issue and advise on follow-up. The contractor can address the item, then the area can be evaluated again if appropriate.
Does clearance cover the entire property?
Clearance addresses the work areas and criteria in the agreed scope. If you want other rooms assessed, discuss that separately before scheduling.
Can the remediation contractor do its own clearance check?
A contractor can document its own work. If your scope calls for independent verification, arrange for a separate assessor to compare the completed areas with the agreed criteria.
What if the original cleanup criteria were never written down?
Share the inspection findings and contractor’s scope before scheduling. We can discuss which criteria need to be clarified and what can be assessed.
Request a clearance inspection quote
Tell us when cleanup will finish, which areas were treated, and whether any project documents specify testing. We’ll discuss what needs to be verified.